水質分析空氣污染及環境保護監測儀器 Water Analysis and Environmental Protection
 
 

 

PM2.5 Sampling Procedures
For PM2.5 sampling the following changes must be made to the filter holder:

  • Ensure that the multiple impactor adapter with the PM10 impactor (silver) is installed on top of the preseparator assembly, while the PM2.5 impactor (gold) is installed in the preseparator assembly.

  • Clean and lubricate the target disk at least every 2-4 sampling periods, or more frequently depending on the degree of impaction stage soiling.

  • After the sampler has been assembled, calibrated, verified to be in proper working order, and a filter loaded in the filter holder assembly, set flow rate adjustment in accordance with procedures as shown in the Operation Manual.

  • Follow all other procedures in the Operation Manual, noting that PM2.5 is being sampled rather than PM10 and TSP.

 

 

v  建成科學儀器股份有限公司     |      網 址: www.ssco.com.tw    |      服務電話:  (02) 29103818     |     傳 真:  (02) 29101316 v